Completed Projects: Mid Clay WWTF Neutralizer Facility

Mid Clay WWTF Neutralizer Facility
Middleburg, FL
$818,620
September 2019
Clay County Utility Authority
J. Collins Engineering Associates
Construction of a pre-engineered metal building foundation and installation of the pre-engineered metal building to house the biosolids processing equipment, including, but not necessarily limited to, concrete foundation, concrete floor and equipment pads, in-slab plumbing, electrical and instrumentation conduit, connections to the various utility pipes serving the building, building electric service conduit and cable, and site work (paving and grading) within 5’ of the building envelope.