Completed Projects: Spencer’s Waste Water Treatment Facility – Phase IV Expansion

Spencer’s Waste Water Treatment Facility – Phase IV Expansion
Middleburg, Florida
$ 8,163,622
March, 2007
Clay County Utility Authority, Florida
North Beach Engineering
Construction of new influent structure with one screenings grinder and removal unit, cyclone grit separator and classifier unit, and odor control system, 2.0 mgd capacity biological treatment unit of prestressed composite construction, aboveground concrete flow splitter box, Two 82-foot diameter secondary clarifiers of prestressed composite construction, Two automatic backwash traveling bridge filters, Two chlorine contact chambers, effluent pump station with two effluent transfer pumps, control building with precast roof system, chemical storage building with precast roofing system, chemical pumping systems, and chemical storage tanks, return activated sludge (RAS) and waste activated sludge (WAS) pumping station with two RAS pumps, WAS pump and precast concrete wetwell, yard pump station with two submersible pumps and precast concrete wetwell, underdrain pump station with two submersible pumps and precast concrete wetwell, wastewater lift station for control building with two submersible pumps and precast concrete wetwell. Conversion of existing steel ring wastewater treatment unit to reject storage tank, Conversion of existing steel ring wastewater treatment unit to aerobic digester, New yard piping including two control valves with in-ground concrete vaults. All related sitework. All related structural work. All related electrical and instrumentation work. All related demolition work.
Spencers_Waste_Water_Treatment_Plant.jpg

Home | Services | About | Contact | News | Bid Room | Current Proejcts | Completed Projects | Employment | Accounts Payable | Admin